Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • All of DSpace
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Kyalo, Dorothy Ndunge"

Now showing 1 - 2 of 2
Results Per Page
Sort Options
  • Loading...
    Thumbnail Image
    Item
    Influence of Organisational Staff Capacity on the Implementation of Electronic Project Monitoring Information System in Public Tertiary Institutions in Kenya
    (2015-10) Mburugu, Kirema N.; Mulwa, Angeline Sabina; Kyalo, Dorothy Ndunge
    This article highlights on the urgent need for staff training on new technologies, provision of adequate ICT infrastructure and staff attitudinal change trainings for effective implementation of new electronic based systems. The article is based on an empirical study carried out in Public Tertiary Institutions in Kenya to the extent of the implementation of Electronic Project Monitoring Information System (e-ProMIS) in the institution. The objective of the study was to establish the organizational internal context on the implementation of e-ProMIS, focusing on influence of staff capacity. The study adopted pragmatic paradigm using mixed mode approach and cross sectional research design with a target population of 460 members of staff from 35 public tertiary institutions in Kenya. A sample of 210 staff was selected using stratified and simple random sampling techniques. Data was collected using questionnaire with both open and structured items with Likert-type interval scale anchored on a five point scale. Descriptive statistics were computed for all variables using arithmetic mean and standard deviation. Statistical tools used for inferential statistic were Pearson’s Product Moment Correlation (r), simple regression, multiple regression and stepwise regression (R2). F-tests were used to test hypotheses in the study. The results revealed that staff capacity had a statistically significant influence on implementation of e-ProMIS. The study confirmed the relevance of Diffusion of Innovation Theory, Theory of Structuration and Technology Acceptance Model in studying implementation of electronic based systems. The study highlights the need for staff training on new technologies, provision of adequate ICT infrastructure and staff attitudinal change trainings for effective implementation of new electronic based systems. The study offers direction to policy makers and practitioners. The study recommends further research to be conducted to establish the influence of monitoring and evaluation on implementation of e-government systems. Other e-government systems like e-procurement and e-tax also need to be studied.
  • Loading...
    Thumbnail Image
    Item
    Influence of Organizational Strategy on Implementation of Electronic Project Monitoring Information System in Public Tertiary Institutions in Kenya
    (2015-09) Mburugu, Kirema N.; Mulwa, Angeline Sabina; Kyalo, Dorothy Ndunge
    The principal objective of the study reported in this article was to empirically assess on the influence of organisational strategy on the implementation of Electronic Project Monitoring Information System (e-ProMIS) in Public Tertiary Institutions in Kenya. The population of the study comprised members of staff from public tertiary institutions in Kenya. A sample of 210 members of staff was selected using stratified and simple random sampling techniques. Questionnaire with both open and closedended items with Likert-type interval scale anchored on a five point scale was used to collect data. Descriptive statistics show that majority of the public tertiary institutions in Kenya applied reactor strategy (M=3.40, SD=1.13) followed by defender strategy (M=2.46, SD=0.56) and a few of them used prospector strategy (M=2.26, SD=0.68). Reactor which was the dominant strategy utilised in tertiary institutions is not a stable strategy since institutions that adopt it are not able to respond effectively to the environment. They adapt only when environmental pressures force them to do so. Results from inferential statistics show that r is equal to 0.513, indicating that organisational strategy has a moderately strong influence on implementation of e-ProMIS. The value of R squared is 0.263, indicating that organisational strategy explains 26.3% of the variation in the implementation of electronic project monitoring information system in public tertiary institutions in Kenya. The β coefficient of prospector strategy is 0.025, that of defender strategy is 0.397 and reactor strategy is 0.217. These results indicate that prospector strategy had no statistically significant influence on the implementation of e-ProMIS (β=0.025, t=0.280, p=0.780>0.05). Comparing the p values, it can be noted that the p values for defender strategy (p=0.000) and reactor strategy (p=0.003) are both statistically significant. The β values imply that one unit change in implementation of e-ProMIS is associated with 2.5% changes in prospector strategy, 39.7% changes in defender strategy and 21.7% changes in reactor strategy.

University of Embu | Library Website | MyLOFT | Chat with Us

© University of Embu Digital Repository. All Rights Reserved.